PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting Derrick -3 2nd Floor Facing South-East (800x600).jpg Finished installing the underground sanitary piping at Room 112-113 (Toilets) Facing South (800x600).jpg Installing rebar mats between Elev. 4 and Stair -2 (4th Floor) Facing South-West (800x600).jpg Poured concrete at Stair -5 slab Facing West (800x600).jpg Stair -5 Delivery Facing South-East (800x600).jpg Started installing the underground sanitary piping at Room 105 (Servery) Facing North-West (800x600).jpg
Previous pageNext page Finished installing the underground sanitary piping at Room 112-113 (Toilets) Facing South (800x600)
Finished installing the underground sanitary piping at Room 112-113 (Toilets) Facing South (800x600)